FLEETWOOD PORTStatutory harbour authority
You are reading Port of Fleetwood

Port of Fleetwood

Swing bridge tide times

The swing bridge crosses the entrance between the lockhead and the marina. It has to be opened for vessels to pass, and it is opened around high water.

Current times

No swing bridge tide times are published for the period from 18/09/2026 onwards.

That is stated plainly because it is the position inherited on transfer. The outgoing operator published these times one month at a time, and only June 2026 and July 2026 were available when the handover records were taken. Nothing is published for August 2026 or later.

Until times are published here

Call the marina office or call Fleetwood Dock on VHF Channel 12 before you plan a passage through the bridge.

Update coming

Swing bridge tide times for 2026 and 2027. This is being confirmed and will be published here.

Update coming

How the swing bridge is operated and requested. This is being confirmed and will be published here.

How the bridge relates to the lock

The lock gates open from 1.5 hours before high water to 1.5 hours after in normal operation, and the times move on neap tides and during sluicing and dredging. Bridge times follow the tide in the same way.

The Fleetwood port information page covers tidal access to the dock in full.

Last updated 20/09/2026.